This time it is a question of 4 soundproofed and soundproofed containerized groups. They are installed in parallel, with a total of 4,000 KVA of standby power provided by high-end MAN engines.
Thanks to the synchronized installation that has been developed for this equipment, the industry is fully prepared not to stop the so precious production, in case of any possible failure of the electrical network, or to be able to launch the energy to the point where it is needed at any time.
The collaboration between the engineering departments of both companies has resulted in the installation of custom-designed and manufactured units, to the satisfaction of the customer and the pride of TECNICS.
We appreciate the trust placed in our company, which beyond covering the technical needs, both in the supply, installation and preventive maintenance that we offer directly, has provided the detail to enhance the local Valencian industry, joining forces to take greater steps into the future.